With the increasing business needs of the border inspection station, the original computer room can no longer meet the actual needs. It is planned to build a standard computer room on the first floor of the office building. The construction content i...
With the increasing business needs of the border inspection station, the original computer room can no longer meet the actual needs. It is planned to build a standard computer room on the first floor of the office building. The construction content includes computer room decoration system, precision air conditioning system, UPS power distribution system, computer room power environment system, computer room gas fire extinguishing system, computer room lightning protection system, additional cabinets and console equipment, etc., so that the computer room after completion is standardized and intelligent, safer and more reliable, easier to maintain, and lower operation and maintenance costs to cope with the growing business needs. Provide a high-standard system environment for the operation of various business systems and equipment, standardize construction, reduce energy consumption, and prevent accidents.